Airport Hangar Epoxy Flooring: What Aerospace Facilities Need to Consider
Airport Hangar Epoxy Flooring: What Aerospace Facilities Need to Consider
Colorado Concrete Repair installs hangar floor coatings for aircraft hangars and aerospace facilities across Colorado.

Since 2009
Commercial and industrial flooring experience across the Denver Front Range.
1,000+ Projects
Company-wide completed projects.
Hangar Flooring — What to Know Before You Specify
Select a topic to see details, performance factors, and considerations.
When Airport Hangar Epoxy Flooring Is the Right SpecificationApplication criteria▼
Best for: Commercial and industrial facilities.
✓ Strengths:
- Flooring work since 2009.
Tradeoffs:
- Not every system fits every environment — wrong product selection causes premature failure
- Professional installation required — this is not a DIY or general-contractor operation
Common applications: commercial and industrial facilities — see our hangar floor systems page.
Aircraft Hangar Floor RequirementsHeavy-load & fuel exposure▼
Best for: FBOs, MRO facilities, private hangars, and aerospace manufacturing floors.
✓ Strengths:
- CCR installs ESD (static-dissipative) systems.
Tradeoffs:
- Hangar floors require extra attention to joint detailing around drain pans
- Large floor areas may require phased installation around aircraft schedules
- Chemical exposure profile varies by aircraft type — must be specified accurately
Common applications: FBOs, hangars, aerospace — see our industrial epoxy systems.
Surface Preparation RequirementsFoundation for performance▼
Best for: Commercial and industrial floor preparation.
✓ Strengths:
- Shot blasting and diamond grinding create the mechanical profile coatings need to bond
Tradeoffs:
- Adds time to the project schedule — but skipping it costs more in premature failure
- Requires specialized equipment and trained operators
- Substrate condition may reveal issues that change the system specification
Common applications: all commercial flooring projects — see our installation process.
CCR’s Installation ApproachProcess & scheduling▼
Best for: Facilities planning phased access or off-hours work.
✓ Strengths:
- Phasing and off-hours work can be part of the quoted plan.
- Flooring work since 2009.
- Post-installation maintenance guidance specific to your system and facility
Tradeoffs:
- Phased installation may extend total project timeline compared to full-facility shutdown
- Quality installation requires adequate cure time between coats — cannot be rushed
Common applications: all CCR flooring projects — request a site assessment.

AIRPORT HANGAR EPOXY FLOORING QUESTIONS
Frequently Asked Questions About Airport Hangar Epoxy Flooring
What should I know before specifying airport hangar epoxy flooring?
The quoted plan can include surface preparation, repairs and phased access.
How does surface preparation affect airport hangar epoxy flooring?
Quoted preparation steps include grinding, HEPA-connected dust collection, patching, and crack and joint repairs.
Can this work be done while our facility stays operational?
Phasing and off-hours work can be part of the quoted plan.
How do I choose the right contractor for airport hangar epoxy flooring?
Look for industrial flooring specialization — not a general contractor who subcontracts flooring. Ask about surface preparation methods, substrate testing, and system specification process. Ask for references from facilities similar to yours. A qualified contractor will ask detailed questions about your facility before recommending a product — not push a single system for every application.