Commercial ESD Flooring
ESD Flooring Denver
ESD Flooring for Your Project Specification
Colorado Concrete Repair offers ESD flooring systems.
OR, TELL US ABOUT YOUR PROJECT:

Floor preparation.
Quick answers · this page
What resistance range does my spec need?
Use your project specification to identify the required resistance and test method. We can do resistance tests on an installed floor.
Can you test our existing floor?
We can do resistance tests on an installed floor.
How can access be planned?
Access, phasing and off-hours can be part of a quoted plan.
ESD Anti-Static Epoxy Flooring: A Practical Guide for Commercial and Technical Facilities
We offer ESD flooring systems.

Since 2009
Commercial and industrial flooring experience across the Denver Front Range.
1,000+ Projects
Company-wide completed projects.
ESD Flooring Systems — What to Know Before You Specify
Select a topic to see details, performance factors, and considerations.
When ESD Anti-Static Epoxy Flooring Is the Right SpecificationApplication criteria▼
If your project calls for an ESD floor, start with its specification. Identify the required system and tests before selecting the floor.
Surface Preparation RequirementsFoundation for performance▼
Surface preparation is 80-90 percent of the time we spend on a job.
✓ Strengths:
- We quote grinding with HEPA-connected dust collection.
- We quote patching, crack repairs and joint repairs.
See our installation process.
CCR’s Installation ApproachProcess & scheduling▼
Access, phasing and off-hours can be part of a quoted plan.
Tradeoffs:
- Cure time depends on the selected product and conditions.
ESD Resistance Classifications and Testing Standards
Use the resistance requirement and test method in your project specification. Check the selected system’s data sheet against those requirements.
Grounding Systems and Static Charge Dissipation
Include grounding details in the floor scope. One of our quoted ESD scopes includes ground straps within the flooring system.
Surface Resistivity Standards and ESD Floor Coating Alternatives
Select the floor from your project specification and the system’s data sheet. We can do resistance tests on an installed floor.
ESD Epoxy and Electrostatic Dissipative Flooring Systems
An existing coating can be part of the removal scope. Our quote for a production ESD room includes coating removal, grinding, repairs, primer, a middle coat and a topcoat.
Request a site assessment.

ESD ANTI-STATIC EPOXY FLOORING QUESTIONS
ESD Anti-Static Flooring — Common Questions for Facility Managers
What should I know before specifying ESD flooring?
Start with the system and tests required by your project specification. If you need resistance tests on an installed floor, we have our own ESD floor test equipment.
How does surface preparation affect ESD floor systems?
Surface preparation is 80-90 percent of the time we spend on a job.
Can this work be done while our facility stays operational?
Access, phasing and off-hours can be part of a quoted plan.
What should I look for in an ESD flooring contractor?
Use your project specification to identify the required system and tests.
What Your Procurement Process Gets — And How the Decision Moves
How the decision moves — the sequence:
- Site assessment. Bring the project specification and identify the floor areas in the proposed scope. Include removal, repairs, grounding, access and cure requirements where the project needs them.
- Your internal approval. Compare the proposed floor scope with your project specification. Confirm the required tests and access arrangements before work starts.
- Access, phasing and off-hours can be part of a quoted plan.
Request a site assessment.
What Your Approval Process Gets
Request a site assessment. Use the proposed scope to review the selected floor, preparation and repairs. Access, phasing and off-hours can be part of a quoted plan. Cure time depends on the selected product and conditions.
Request an ESD Flooring Assessment in Denver, CO
Tell us about your facility.
Conductive vs. Static-Dissipative Flooring — Which Does Your Spec Require?
| Property | Conductive (ECF) | Static-Dissipative (SDF) |
|---|---|---|
| Resistance to ground | Use the selected system’s data sheet. | Use the selected system’s data sheet. |
We have installed ESD floors to project specifications that use ANSI/ESD S7.1 and require resistance below 1 × 10⁹ ohms. Each system’s data sheet lists its own standards and electrical properties. We have invested in our own ESD floor test equipment. We can do resistance tests on an installed floor.
ESD Floor Resistance Tests
We can do resistance tests on an installed floor.
ESD Flooring for Aerospace and Defense Facilities
See our aerospace and defense flooring page and our data center flooring page.
ESD Verification Questions
What resistance range does an aerospace ESD floor need?
Use your project specification to identify the required system and tests. Include the resistance requirement and the test method in your floor scope. We can do resistance tests on an installed floor.
Does ESD flooring need special maintenance?
Use the selected system’s maintenance instructions. Include those instructions when your team reviews the selected floor.
Can you test our existing floor?
We can do resistance tests on an installed floor. Bring the resistance requirement and test method from your project specification.
Call 720-780-9498, or Request a Site Assessment.
Why Colorado Concrete Repair
Nick, owner. Since 2009.
