Plant Floors for Electronics and Electrical Equipment Makers, From Assembly and Test Rooms to Production and Shipping

Colorado Concrete Repair is a commercial flooring contractor based in Denver. This page covers electronics and electrical equipment plants area by area. Assembly and test rooms may need static-control flooring where your ESD program calls for it. Production and warehouse floors may need a resin coating, and some floors need concrete repair, grinding or sealing first. Locally owned in Denver since 2009.


OR, TELL US ABOUT YOUR PROJECT:

Share your project details →

Area-by-Area Planning

Assembly, test, lab, production and shipping areas often need different floors. We plan each one around how it is actually used.

More Than 1,000 Jobs

A company-wide count. We belong to Associated General Contractors (AGC).

Prep in Writing

Our static-control quotes list grinding or shot blasting to a CSP of 2 or greater, on equipment attached to HEPA filter vacuums.

Floor Problems Electrical and Electronics Manufacturers Bring Us

Static-sensitive assembly and test areas

Where your ESD program sets floor requirements, the floor has to fit that program. We work from your specification and the area’s use. Some of our ESD quotes include resistance testing after the floor cures.

Labs and clean, controlled rooms

Lab and controlled rooms usually need a seamless, cleanable floor and careful dust control during the work. We plan containment and sequencing with your team for each room.

Production floors with forklifts and carts

Forklifts, carts and pallet jacks wear coatings and break down joints. We look at traffic paths, joint condition and how the floor has worn before recommending a system.

Chemical and solvent exposure

Cleaning agents, solvents and process fluids vary by plant. We match the system to what your floor is actually exposed to, using the selected product’s published chemical-resistance information.

Dust from the slab

Untreated or worn concrete sheds dust into production and test areas. Grinding and sealing, polished concrete or a resinous coating can reduce dusting from the slab surface; the right choice depends on the area.

Working around production

Most plants can’t stop for a floor. Work can often be phased by area around shifts, nights or weekends where your site allows; the schedule, and when each area can be back in use, are agreed for your site based on the selected system.

Space & Aerospace Electronics Manufacturing

Space-industry and aerospace-electronics manufacturers combine several of these needs in one building: static-sensitive assembly and test areas, lab rooms, and production and shipping floors. Our ESD quotes include resin static-control systems and ElectraSeal ESD grind-and-seal scopes, and one of our static-control quotes is for an aerospace floor. For hangar, MRO and defense facility floors, see aerospace and defense facility flooring.

Floor Systems for Electrical and Electronics Plants

Static-control (ESD) flooring

Our ESD quotes name systems such as Sherwin-Williams Resuflor® Topcoat SDU over Resuflor MVB and MPE epoxy, Resinwerks EPX-ESD (VBE primer, ESD Level-Guard EP mid coat, HDC 100 ESD topcoat) and ElectraSeal® ESD Control Concrete Sealer in a grind-and-seal. Some also price a standard urethane topcoat with no static-dissipative properties as an option. See ESD flooring systems and testing for system and test details.

ESD floor testing when the quote includes it

Some of our ESD quotes include resistance testing after the floor cures. One lists testing with our standard resistivity megohmmeter once the installation has cured. Another includes acceptance system or surface resistance (ASR) testing after installation. Floor test results alone do not certify an entire facility or ESD control program.

Epoxy and resinous systems

For production, warehouse and shipping floors that don’t need static control, industrial epoxy flooring and other resinous systems are selected for traffic, cleaning and chemical exposure. Where wet, hot or harsh conditions apply, urethane cement may fit.

Concrete repair, grinding and sealing

Cracks, spalls and failed joints usually come first: concrete repair, concrete grinding and grind and seal for areas where a sealed concrete finish is the right fit. Aisle and safety markings: line striping.

How We Work

Walk the floor with your team

We look at the visible condition of the floor, ask your facility and maintenance team about its history, and learn how each area is used and cleaned.

Match the system to each area

ESD where your program calls for it; resinous, sealed or repaired concrete elsewhere. If a specific moisture, structural or static-control question needs testing or a specialist, we identify that for the project rather than testing every slab by default.

Plan around production

When we can have each area, what order we work in, dust control and when floors can be back in use are agreed with your team before work starts.

Install and hand off

Prep and repairs, installation as the manufacturer and project specification require, a final walkthrough and care guidance. For ESD areas, documented floor resistance readings when the project calls for them.

What Our Static-Control Quotes List

  • Resuflor static-control scopes list grinding or shot blasting to a CSP of 2 or greater, an epoxy patch for holes, joints and cracks that cures overnight and is ground flush the next day, then Resuflor MVB primer, MPE mid coat and Topcoat SDU.
  • Several of those quotes place about one ground strap in the floor every 1,000 sq ft.
  • ElectraSeal grind-and-seal scopes list 30-grit to 80-grit diamond tooling, cracks and voids filled with cementitious material and ground flush, and the sealer coats as the maker’s instructions direct.
  • Where elevated RH was observed in the area, one ESD quote added a moisture vapor barrier primer step.

Customer names and project details are kept private.

Electrical & Electronics Manufacturing Flooring — Common Questions

Do we need ESD flooring throughout the plant?

Usually not. ESD flooring is for areas your ESD program identifies as static-sensitive, such as assembly and test areas. Production, warehouse and shipping floors often need a different system. We plan each area separately.

Who installs ESD flooring in an electronics plant?

We do, from Denver. Our static-control quotes list grinding or shot blasting to a CSP of 2 or greater on HEPA-vacuum equipment, an epoxy patch for holes, joints and cracks ground flush, then the primer, mid coat and ESD topcoat. Several place about one ground strap per 1,000 sq ft. See ESD flooring systems and testing for system and test details.

Can you test our existing ESD floor?

Two of our ESD quotes include resistance testing on the new floor after installation. One lists our standard resistivity megohmmeter once the floor has cured. The other lists ASR testing. Floor test results alone do not certify an entire facility or ESD control program.

Can you work while production continues?

Often, yes. Work can be phased by area around shifts, nights or weekends where your site allows. The schedule, and when each area can be back in use, depend on the selected system and are agreed for your site. We don’t promise zero downtime.

Do we need to test our slab before we call?

No. Tell us which areas need work and share any static-control specification or prior floor readings you have. On one ESD quote, elevated RH seen in the area added a moisture vapor barrier primer step. Our ElectraSeal grind-and-seal quotes call that sealer moisture tolerant.

Do you work with space and aerospace electronics manufacturers?

Yes, we quote floors for them. One of our static-control quotes is for an aerospace floor and includes ASR testing after installation. Our other ESD quotes include resin static-control systems and ElectraSeal ESD grind-and-seal scopes. For hangars and MRO facilities, see our aerospace and defense flooring page.

Request an Electrical & Electronics Manufacturing Flooring Assessment

Tell us which areas need work, what happens on each floor and when your team can give a crew access. If you have a static-control specification or prior floor test results, share them; you do not need to commission testing before the first conversation.