Why Hire an Epoxy Flooring Specialist for a Commercial Facility

Reviewed June 12, 2026 · Nick Ferguson, owner — industrial flooring contractor, Denver, since 2009

Why Hire an Epoxy Flooring Specialist for a Commercial Facility

Since 2009, Colorado Concrete Repair has been a commercial flooring contractor in Denver. We install commercial epoxy flooring on commercial and industrial floors. This guide is for facility managers choosing an epoxy flooring contractor or epoxy floor installer. It covers what a specialist’s quote should list. It is not about garage or basement floors; pole barns are the one house-property exception.

epoxy flooring specialist — why hire epoxy flooring specialist

Since 2009

Commercial and industrial floors, based in Denver.

Over 1,000 Jobs

A company-wide count.

Written Scopes

Our quotes list the prep, each coat by product and what is excluded.

Epoxy Flooring Systems — Matched to Your Facility

Select a system type to see specifications, strengths, and tradeoffs.

100% Solids High-Build EpoxyHeavy-duty industrial▼

Best for: Commercial and industrial floors that get a full epoxy system. Some of our quotes list a 100% solids epoxy primer under an epoxy slurry about 1/8 in thick, then LevelGuard EP epoxy coats. The maker’s data sheet sets the chemical and impact ratings.

✓ Strengths:

  • Each coat named by product in the written quote, for example Resuflor MVB primer and MPE mid coat
  • Grinding to a stated profile, such as a CSP of 2 or greater, on equipment attached to HEPA filter vacuums
  • Cracks, spalls and joints prepped, filled and ground flush where the quote lists them
  • Polyaspartic appears as a topcoat in some of our quotes

Tradeoffs:

  • Forklifts can be hard on epoxy; one buyer wrote that forklifts “aren’t friendly to epoxy unless they’re small and have white tires”
  • Moisture in the concrete above the limits in our standard terms may mean the primer is replaced with a moisture mitigation system, as a change order
  • Cure time depends on the selected product and conditions

Common applications: warehouses, manufacturing, fleet garages — see our commercial epoxy flooring page.

Novolac Chemical-Resistant EpoxyChemical containment zones▼

Best for: Rooms with stronger chemical exposure. We offer novolac epoxy, and some of our urethane cement quotes add a Resinwerks novolac epoxy topcoat. The maker’s data sheet states which chemicals the product resists.

✓ Strengths:

  • Product named in the quote, for example Resinwerks Novolac Epoxy
  • Installed in accordance with the manufacturer’s written instructions
  • Chemical ratings taken from the maker’s data sheet for the named product
  • Can be quoted as a topcoat over urethane cement

Tradeoffs:

  • No universal chemical rating; product, thickness and exposure change the answer
  • Cleaning chemicals and water can weaken a bond; one food plant buyer wrote that “cleaning chemicals and water have weakened the bond”
  • For hot water washdown, Resinwerks lists its BioCem MF urethane cement for “frequent hot water washdowns”

Common applications: chemical containment, pharmaceutical, battery rooms, processing — see our installation process.

Quartz Broadcast EpoxyAnti-slip & textured finishes▼

Best for: Floors where you want texture in the coating. Some of our quotes broadcast quartz into a 100% solids epoxy coat, then sweep and HEPA vacuum the excess before the next coat. You approve texture, slip resistance and cleanability on samples.

✓ Strengths:

  • Quartz broadcast and each coat named by product in the quote
  • Excess quartz swept and HEPA vacuumed before the next coat
  • Color, texture, slip resistance and cleanability approved on samples before the project starts
  • Topcoat named in the quote, such as a polyaspartic over the quartz

Tradeoffs:

  • No slip rating is promised; you approve the texture on samples
  • Patching of divots, voids and slope or fill is excluded from base pricing
  • Cure time between coats depends on the selected product and conditions

Quartz broadcast systems appear in some of our quotes — see our epoxy flooring systems.

Polyaspartic Topcoat SystemsFast-cure & UV-stable▼

Best for: A topcoat over an epoxy or urethane cement base. Polyaspartic appears as a topcoat in our scopes, over epoxy or urethane cement coats. The maker’s data sheet sets the cure and return-to-service times.

✓ Strengths:

  • Quoted by product, for example Kinetic HS High Solids, Low Odor Polyaspartic Coating
  • Some quotes add a traction additive for slip and wear resistance characteristics
  • Cure and traffic times come from the maker’s data sheet, not from us
  • Some quotes name a fast-curing, heavy-traffic polyaspartic topcoat

Tradeoffs:

  • Quoted as a topcoat in our scopes, over an epoxy or urethane cement base
  • Moisture limits for any basecoat come from the maker’s data sheet
  • Pot life and working time come from the maker’s data sheet

Common applications: fast-turnaround installs, UV zones, Resinwerks polyaspartic systems.

A newly finished epoxy urethane floor in a manufacturing facility.
Photo for illustration.

COMMERCIAL EPOXY FLOORING QUESTIONS

Frequently Asked Questions

How long does commercial epoxy flooring last?

It depends on traffic, chemical exposure, maintenance and the selected product. We don’t give a service life as our own number. The maker’s data sheet sets the ratings for the named product, and we choose the system for your actual operating conditions.

What surface preparation does epoxy flooring require?

Some of our epoxy quotes list grinding or shot blasting to a CSP of 2 or greater, with equipment attached to HEPA filter vacuums. Cracks, spalls and joints are filled and ground flush where listed. Our terms assume moisture under 3 lbs per 1,000 sq ft or 75% RH; above that, a mitigation system may replace the primer.

Can epoxy be applied over existing coatings?

Sometimes. It depends on whether the old coating is still sound and bonded, and on what is in the concrete. When the scope calls for it, our quotes list removal of the existing flooring before grinding. Epoxy will not stay bonded to concrete with oil contamination in it. On heavily contaminated slabs, a polish is often the lower-risk system.

How soon can we use the floor after epoxy installation?

It depends on the selected product and conditions. The maker’s data sheet sets the times for foot traffic, vehicle traffic and chemical service, and we don’t publish our own numbers. Phasing and off-hours work can be part of the quoted plan, so some areas stay in use while others are installed or cured.

What is the difference between epoxy and polyaspartic?

Both are resin coatings. In our quotes, epoxy shows up as primer and body coats, and polyaspartic shows up as a topcoat over epoxy or urethane cement. Some quotes name a fast-curing, heavy-traffic polyaspartic. Each maker’s data sheet sets that product’s cure, moisture and wear limits, so the right pairing depends on the floor.

Request a Site Assessment

Tell us about your facility. We’ll evaluate your substrate, chemical exposure, traffic, and operating conditions — then recommend the system that fits.

Or request a site assessment online